XJ Critical Path Subframe Assembly

XJ Critical Path Subframe Assembly
    Details
    Price:
    $329.99
    Code: 10465
    Weight: 28.00 pounds
    Rating: Not Yet Rated | Write the First Review
    Add To Wishlist

    • Keep your belly high with the highest clearance Cherokee subframe available!
    • All 1/4" steel construction. All the subframe parts are laser cut and precision CNC brake formed.
    • Three piece design. This allows you to remove the center section so that you can work on/remove your transfer case and transmission without having to mess with your suspension! That's right, your long arms stay bolted securely in place while the center crossmember is removed.
    • We have included a built in 1" drop option that gives you the choice to easily drop your t-case for better driveshaft angles. This option is standard and is not required for those who have, or will install, a slip yoke eliminator. Either way, you have the option to use the drop or not at no extra charge!
    • Each frame mount covers a lot more surface area than the factory crossmember, spreading the stress of the drivetrain and suspension over a much larger uni-frame surface area.
    • It is bolt in! This makes it simple to install for anybody with basic hand tools. For those of you who prefer a weld in kit, the subframe parts are also great to weld in place for added security.

    Customer Ratings & Reviews

    Be the first to rate this item!

    Write Review

    Prop 65 Warning: CALIFORNIA WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
    close