XJ 4" Critical Path Long Arm Lift Kit

XJ 4" Critical Path Long Arm Lift Kit
    Details
    Price:
    $1,099.99
    Code: 10439
    Weight: 180.00 pounds
    Rating: Not Yet Rated | Write the First Review
    Add To Wishlist

    Tested on some of the most difficult trails on the IronRange of Northern Minnesota, this kit has what you need torun 32" tires and go almost anywhere. Installing this suspension immediately gives youa huge off road performance advantage over stock without sacrificing good ride quality on the road. This is a complete kit that comes with everything you need and nothing you don't!

    KIT INCLUDES:
    • Critical Path Long Arms
    • 3 piece subframe assembly
    • 7.5° Caster adjusting bracket
    • 4" front coil springs
    • 1.5" rear lift shackle
    • 2.5" rear add-a-leaf kit
    • Front and rear shock absorbers
    • Front sway bar links
    • Transfer case drop kit
    • U-Bolt set (specific to your vehicle)
    • Brake line relocation bracket
    • Hardware

    IMPORTANT FITMENT NOTE: Front long arm system will not fit the 1999 XJ with the 4 cylinder engine and 5 speed transmission.  2000 and 2001 models with automatic transmissions will require old style transmission mount such as 2625

    INSTRUCTIONS:


    HERE'S A QUOTE FROM AN EMAIL WE RECEIVED REGARDING THISKIT, "I have gotten so many compliments on how much this kit flexes, I have already had numerous flex competitions with friends with rubicon express and their flex does not even compare. Thanks again!" Q.M. Murieta, CA


    Recommended tire size: 32"x11.50" – or metric equivalent

    Recommended wheel backspacing: 4.5-6"
    TRIMMING MAY BE REQUIRED
    Larger tire sizes possible with bumper/fender trimming and/or extended bump stops.

    Estimated Installation Time: 8-10hrs

    Difficulty Level: 3


    Difficulty Legend

    1 - Kit includes basic components.

    2 - Kit includes little to no adjustable components.

    3 - Kit includes many adjustable components; may require drilling/cutting.

    4 - Kit includes many adjustable components; requires welding; may require drilling/cutting.


    NOTE - Labor Time and Difficulty Level assumes vehicle and/or hardware is in good condition.

    Customer Ratings & Reviews

    Be the first to rate this item!

    Write Review

    Prop 65 Warning: CALIFORNIA WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
    close