XJ 8" Critical Path Long Arm Lift Kit

XJ 8" Critical Path Long Arm Lift Kit
    Details
    Price:
    $1,949.99
    Code: 10451
    Weight: 310.00 pounds
    Rating: Not Yet Rated | Write the First Review
    Add To Wishlist

    Want to run 35" tires* on your Cherokee and score 1100+ on the RTI? We have put together the most aggressive and capable 8" kit anywhere at a price that can't be beat!!Keeping your tires on the ground is a key component to excellent traction. Disconnect your front sway bar and the long arm system will provide more articulationthan you thought possible! This means in the most difficultterrain, this suspension will keep you moving forward.

    FRONT END
    • Abuse this lift on the trail with confidence. 2" x 5/16" wall DOM make up the long arms so you know they are strong.
    • These long arms also featurean inboard directed bend that allow you to clear 37" tires at full lock steering without rubbing on the control arms! Thismeans you will retain the tight, nimble steering your XJhas always offered you.
    • Included is our unique caster adjuster bracket will allow you to perfectly set your casterafter installation. It gives 7.5 degrees of adjustability,which is more than enough even if you intend on going taller later on!
    • The long arms are the ideal length for the 4.5-8" of lift, perfectly centering your axle and tires on compression.
    • You'll get as much travel as your shocks will allow (DT8000 shocks willafford you the longest travel for this lift).
    • The double shear track bar conversion gets you several upgrades in one! First, it is made from 1.25" solid cold rolled steel so strengthis not a concern. Second, it is longer than the factory barand others that mount in the factory location giving you better suspension geometry and less bump steer. Third, the frame side bracket lowers the mounting point by about 3/4" giving you an even better track bar angle. Finally, the ball joint style mount is eliminated and replaced with astronger set up that allows infinitely more articulationthan the ball joint (or more simply put, it will not limit yoursuspension from flexing out).
    SUBFRAME
    • Keep your belly high with the highest clearance Cherokeesubframe available!
    • All 1/4" steel construction. All the subframe parts are laser cut and precision CNC brake formed.
    • Three piece design. This allows you to remove the centersection so that you can work on/remove your transfer caseand transmission without having to mess with your suspension! That's right, your long arms stay bolted securely in place while the center crossmember is removed.
    • We have included a built in 1" drop option that gives youthe choice to easily drop your t-case for better driveshaft angles.This option is standard and is not required for those who have, or will install,a slip yoke eliminator (A SLIP YOKE ELIMINATOR IS REQUIRED FOR THIS LIFT HEIGHT). Either way, you have the option to use the drop or not at no extra charge!
    • Each frame mount covers a lot more surface area than the factory crossmember, spreading the stress of the drivetrain and suspension over a much larger uni-frame surface area.
    • It is bolt in! This makes it simple to install foranybody with basic hand tools. For those of you who prefera weld in kit, the subframe parts are also great to weld in place for even better strength.
    REAR END
    • 5.5" ultra premium leaf spring packs featuring: militarywrapped Berlin eye ends, 7 thin leaf design, tapered endswith Teflon anti-friction pads.
    • 1" HD Add-a-Leaf
    • 1.5" heavy duty lift shackle not only gives you the additional inch of lift, but also improved suspension articulation in therear of your XJ.

    KIT INCLUDES:
    • 3 Piece High Clearance HD Subframe Assembly
    • Front Long Arms with 7.5° Caster Adjuster
    • 8" Coil Springs
    • 5.5" Leaf Springs
    • 1" Lift Add a Leaf
    • 1.5" Lift Shackle
    • Hydro 8000 Shocks
    • HD Track Bar with Double Shear Frame Mounting Bracket
    • Extended Length Stainless Steel Brake Hoses
    • Extended Length Front Sway Bar Links
    • Drop Pitman Arm
    • U-Bolts
    • All necessary hardware

    IMPORTANT FITMENT NOTE: Front long arm system will not fit the 1999 XJ with the 4 cylinder engine and 5 speed transmission.  2000 and 2001 models with automatic transmissions will require old style transmission mount such as 2625

    INSTRUCTIONS:


    HERE'S A QUOTE FROM AN EMAIL WE RECEIVED REGARDING THISKIT, "I have gotten so many compliments on how much this kit flexes, I have already had numerous flex competitions with friends with rubicon express and their flex does not even compare. Thanks again!" Q.M. Murieta, CA


    Click on thumbnails for larger product features.

    HD Subframe Assembly

    Super-Flex Joints

    Super strong track bar
    and mounting bracket

    5/16" Wall DOM Tubing

    Stainless steel braided
    brake hoses

    Recommended tire size: 35"x12.50" – or metric equivalent

    Recommended wheel backspacing: 4"
    TRIMMING MAY BE REQUIRED
    Larger tire sizes possible with bumper/fender trimming and/or extended bump stops.

    Estimated Installation Time: 8-10hrs

    Difficulty Level: 3


    Difficulty Legend

    1 - Kit includes basic components.

    2 - Kit includes little to no adjustable components.

    3 - Kit includes many adjustable components; may require drilling/cutting.

    4 - Kit includes many adjustable components; requires welding; may require drilling/cutting.


    NOTE - Labor Time and Difficulty Level assumes vehicle and/or hardware is in good condition.

    Customer Ratings & Reviews

    Be the first to rate this item!

    Write Review

    Prop 65 Warning: CALIFORNIA WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
    close